Categories

IEC/EN 61000-4-11

OTHER PRODUCTS IN THE SAME STANDARD:

  • Turnkey EMC test solution — ready to use with full hardware and software integration
  • Fast voltage transitions (<5 µs) for full compliance with critical standards
  • Covers all major IEC/EN 61000-4-X tests including -11, -13, -14, -27, -28, -34
  • User-friendly ACSControl software with built-in test libraries and reporting
  • Modular, scalable power platform from 30 kVA up to 2000+ kVA
  • Versatile use beyond EMC: ideal for grid simulation, anti-islanding, and inverter testing
  • Compact 19" rack-mounted units — easy system integration and footprint optimization
  • Certified for global compliance (CE, UKCA, RoHS, EN/IEC EMC and safety standards)

Axos 5 - Compact

  • Multi Tester with 16AMP CDN
  • EFT/Burst 5kV IEC 61000-4-4
  • Surge, Combination Wave 5kV IEC 61000-4-5
  • Surge Magnetic field IEC 61000-4-9 (MSURGE-A loop antenna required)
  • AC Dips/Drops IEC 61000-4-11 (DIP 116 dips transformer required)
  • DC Dips/Drops IEC 61000-4-29 (2x DC supplies required)

Axos 8 - Compact

  • Multi Tester with 16AMP CDN
  • EFT/Burst 5kV IEC 61000-4-4
  • Surge, Combination Wave 7kV IEC 61000-4-5
  • Surge Magnetic field IEC 61000-4-9 (MSURGE-A loop antenna required)
  • Ring Wave, 7kV IEC 61000-4-12 & ANSI
  • Telicomm Wave, 7kV IEC 61000-4-5 & ITU
  • AC Dips/Drops IEC 61000-4-11 (DIP 116 dips transformer required)
  • DC Dips/Drops IEC 61000-4-29 (2x DC supplies required)

PEFT 8010 

  • EFT/Burst
  • Up to 7.3kV (6.6kV at CDN)
  • CDN: 264V-AC 16-440Hz, 125V-DC
  • CDN: 16A-AC @ 50-60Hz, 10A-AC @ 400Hz, 16A-DC

The Conformity Assessment Business Model CAB1001 Surge Inrush Compensator enables users to meet the 500A inrush requirement of EN 61000-4-11 irrespective of supply impedance.

The Power Fail Simulator PFS-CE-16 is a compact EMC test unit designed for testing electromagnetic immunity against interruption and variation of the power supply voltage acc. to IEC 61000-4-11. Demonstrating such immunity is generally a requirement of the European EMC directive, a necessary step leading to the final attachment of the CE mark.

Loading...