IEC / EN 61000-4-2 The test generator SESD 230 simulates electrostatic discharge as defined in the standard IEC / EN 61000-4-2. Depend on the Equipment Under Test (EUT) and the test set-up for laboratory tests the IEC standard shows two test methods; Test voltage max. 30,0 kV AIR und CON; Discharge impedance 150pF/330 Ohm (IEC); Battery or mains operation; Predefined tests, standard and other
The capacitive Coupling-/Decoupling Networks CDN 5416/7416/10416/12416 are used in combination with the Multi-CE5 or the Surge generators PG 7-250, PG 10-504, PG 12-804 and allow superimposition of surge and burst test pulses to the 3-phase mains voltage of the device under test.
IEC / EN 61000-4-2 The test generator SESD 216 simulates electrostatic discharge as defined in the standard IEC / EN 61000-4-2. Depend on the Equipment Under Test (EUT) and the test set-up for laboratory tests the IEC standard shows two test methods; Air discharge (AIR) and Contact discharge (CON); Test voltage max. 16,5 kV AIR, max. 10,0 kV CON; Discharge impedance 150pF/330 Ohm (IEC); Battery or mains operation; Predefined tests - standard and other
The capacitive Coupling-/Decoupling Networks CDN 5432/7432/10432/12432 are used in combination with the Multi-CE5 / Multi-CE7 or the Surge generators PG 7-250, PG 10-504, PG 12-804 and allow superimposition of surge and burst test pulses to the 3-phase mains voltage of the device under test.
The Wood Test Table is a simple, inexpensive solution for your EMC testing. The table is built to be ship flattened to reduce shipping costs and easily assembled on site quickly. The picture is shown with a ground plane.
The ESD Test Table Kit is a simple inexpensive solution for your ESD testing. Complies to the requirements of IEC 61000-4-2 and can be used for additional standards. Comes with a Horizontal Coupling Plane (HCP), resistive cable to tie HCP to floor ground plane, bleeder wire for discharging ungrounded battery powered EUTs, 0.05mm insulator and an alternative low impedance ground for using the table for additional setups such as IEC 61000-4-6 requirements.
The external impedance IMP8 is the impedance, required for the pulse specifications according to standard IEC 61000-4-5 Ed.3, for measuring the pulse output voltage of surge generators.
The Surge Calibration Kit has been designed to measure the pulse output voltage and the pulse output current of surge generators, e.g. a combination wave generator. It essentially consists of a pulse voltage divider, a pulse current measuring resistor, and a double-shielded coaxial cable.
The Surge Calibration Kit has been designed to measure the pulse output voltage and the pulse output current of surge generators, e.g. a combination wave generator. It essentially consists of a pulse voltage divider, a pulse current measuring resistor, and a double-shielded coaxial cable. The unit is easy to connect and use for everyday pulse verification.
Motor-driven variable transformer, controlled by Multi-CE5 or Multi-CE7, used for power supply variation acc. to IEC 61000-4-11 and setting current for IEC 61000-4-8 Magnetic fields
The Capacitive Coupling Clamp, EFTC 2012, provides the ability to couple Burst / EFT pulses to data lines. It can also be used for coupling to main lines where no CDN is available, for example, high current lines >200 A.
The capacitive Coupling-/Decoupling Networks CDN 5463/7463/10463/12463 are used in combination with the Multi-CE5 / Multi-CE7 or the Surge generators PG 7-250, PG 10-504, PG 12-804 and allow superimposition of surge and burst test pulses to the 3-phase mains voltage of the device under test.