The external impedance IMP8 is the impedance, required for the pulse specifications according to standard IEC 61000-4-5 Ed.3, for measuring the pulse output voltage of surge generators.
The Surge Calibration Kit has been designed to measure the pulse output voltage and the pulse output current of surge generators, e.g. a combination wave generator. It essentially consists of a pulse voltage divider, a pulse current measuring resistor, and a double-shielded coaxial cable.
IEC / EN 61000-4-2 The test generator SESD 216 simulates electrostatic discharge as defined in the standard IEC / EN 61000-4-2. Depend on the Equipment Under Test (EUT) and the test set-up for laboratory tests the IEC standard shows two test methods; Air discharge (AIR) and Contact discharge (CON); Test voltage max. 16,5 kV AIR, max. 10,0 kV CON; Discharge impedance 150pF/330 Ohm (IEC); Battery or mains operation; Predefined tests - standard and other
IEC / EN 61000-4-2 The test generator SESD 230 simulates electrostatic discharge as defined in the standard IEC / EN 61000-4-2. Depend on the Equipment Under Test (EUT) and the test set-up for laboratory tests the IEC standard shows two test methods; Test voltage max. 30,0 kV AIR und CON; Discharge impedance 150pF/330 Ohm (IEC); Battery or mains operation; Predefined tests, standard and other
The ESD simulator SESD 30000 is suitable for EMC testing of systems and equipment in accordance with standard IEC / EN 61000-4-2, ISO 10605 (Automotive), MIL-STD and other. The modular structure of the simulator allows further testing according to different standards and customer definitions. Test voltage max. 30,0 kV AIR and CON; Discharge impedance IEC, ISO, MIL etc.; Modular structure, self-test; Automatic charge absorber integrated;
The Microsoft-Windows based software controls the ESD generator via a serial interface
The Multi-CE5 is a compact EMC test unit designed for testing electromagnetic immunity against pulsed and conducted interference. Demonstrating such immunity is generally a requirement for compliance with the European EMC directive, a necessary step leading to the CE mark. In its basic configuration, the Multi-CE5 includes an Electrical Fast Transient Generator (EFTG), a Combination Wave Generator (CWG) and a Coupling-/Decoupling Network (CDN) for single-phase power supply lines.
The Multi-CE7 is a compact EMC test unit designed for testing electromagnetic immunity against pulsed and conducted interference. Demonstrating such immunity is generally a requirement for compliance with the European EMC directive, a necessary step leading to the CE mark. In its basic configuration, the Multi-CE5 includes an Electrical Fast Transient Generator (EFTG), a Combination Wave Generator (CWG), Option: RingWave Generator (RWG), Option: 10/70 Telecom Generator (TWG), Option: Dip/Drops/Interruptions, and a Coupling-/Decoupling Network (CDN) for single-phase power supply lines.
Hilo Remote Control is software for personal computers. It is used to control HILO-Test generators from your computer. The software allows users to create tests and reports, which can be changed with your default text editor. In addition, it allows an oscilloscope to monitor all test pulse and to store the captured image of the waveforms on the computer. The communication with the generator is implemented with a LAN connection. The generator is connected via an optical interface. Thus, the PC is completely disconnected from the generator.